Access the full text.
Sign up today, get DeepDyve free for 14 days.
References for this paper are not available at this time. We will be adding them shortly, thank you for your patience.
line, n. […] 4. cord for measuring, levelling etc. […] 6. long narrow mark traced on surface. O.E.D. Between the design and the realization of a building there are a number of ‘drawing’ processes, either on the building site or in the workshop, which range from the setting out of the plan to the production of ‘shop drawings’ from which details are derived. Unfortunately, while the latter have survived in sufficient numbers to have attracted scholarly attention, the setting out of the ground plan leaves no trace. Nevertheless, it is that process that determines the building's basic geometry. While much scholarly effort has gone into attempting to divine the geometrical principles behind designs from Antiquity to the Gothic period, it has not always been informed by an understanding of the setting-out process. Without taking the constraints of that process into account, one is reduced to looking for geometrical relationships within the building, and of course one will find some. Clearly, there were geometrical principles behind almost all buildings, if only that they should be rectangular or symmetrical, but the difficulty is that a few simple rules can easily result in a large number of geometrical relationships within the building that were not used, and possibly not even recognized, by their designers. At the very least, therefore, we should consider how to distinguish those relationships that were actually used by the designers and builders from those that are merely epiphenomenal.
Architectural History – Cambridge University Press
Published: Apr 11, 2016
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.