Get 20M+ Full-Text Papers For Less Than $1.50/day. Start a 14-Day Trial for You or Your Team.

Learn More →

A Combined Data and Power Management InfrastructureCDPI System Testing

A Combined Data and Power Management Infrastructure: CDPI System Testing [Both the modularity and the novelty of the presented CDPI infrastructure require extensive system testing. This chapter provides an overview on the applied test program for the CDPI, starting on board level and going up to system tests to cover the proper integrated functionality of OBC and PCDU.] http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png

A Combined Data and Power Management InfrastructureCDPI System Testing

Loading next page...
 
/lp/springer-journals/a-combined-data-and-power-management-infrastructure-cdpi-system-eYaQKr0mAg

References (0)

References for this paper are not available at this time. We will be adding them shortly, thank you for your patience.

Publisher
Springer Berlin Heidelberg
Copyright
© Springer-Verlag Berlin Heidelberg 2013
ISBN
978-3-642-35556-1
Pages
173 –194
DOI
10.1007/978-3-642-35557-8_9
Publisher site
See Chapter on Publisher Site

Abstract

[Both the modularity and the novelty of the presented CDPI infrastructure require extensive system testing. This chapter provides an overview on the applied test program for the CDPI, starting on board level and going up to system tests to cover the proper integrated functionality of OBC and PCDU.]

Published: Jun 14, 2013

Keywords: Engineer Model; Attitude Control System; Engineer Model; Test Execution; Onboard Computer

There are no references for this article.