A Combined Data and Power Management InfrastructureCDPI System Testing
A Combined Data and Power Management Infrastructure: CDPI System Testing
Fritz, Michael; Bucher, Nico; Witt, Rouven
2013-06-14 00:00:00
[Both the modularity and the novelty of the presented CDPI infrastructure require extensive system testing. This chapter provides an overview on the applied test program for the CDPI, starting on board level and going up to system tests to cover the proper integrated functionality of OBC and PCDU.]
http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.pnghttp://www.deepdyve.com/lp/springer-journals/a-combined-data-and-power-management-infrastructure-cdpi-system-eYaQKr0mAg
A Combined Data and Power Management InfrastructureCDPI System Testing
[Both the modularity and the novelty of the presented CDPI infrastructure require extensive system testing. This chapter provides an overview on the applied test program for the CDPI, starting on board level and going up to system tests to cover the proper integrated functionality of OBC and PCDU.]
Published: Jun 14, 2013
Keywords: Engineer Model; Attitude Control System; Engineer Model; Test Execution; Onboard Computer
To get new article updates from a journal on your personalized homepage, please log in first, or sign up for a DeepDyve account if you don’t already have one.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.