Get 20M+ Full-Text Papers For Less Than $1.50/day. Start a 14-Day Trial for You or Your Team.

Learn More →

A Passion for SpaceSTS-3: Realtime Flight Planning

A Passion for Space: STS-3: Realtime Flight Planning [Because the STS-3 crew, Jack Lousma and Gordon Fullerton, suffered from space adaptation syndrome, Mission Operations Director Gene Kranz ordered the first woman Flight Activities Officer, Carolynn Conley, and the author who was the lead Timeline for the flight, to “swap” two days of the Crew Activity Plan. The only way to transmit the changes to the crew was via a primitive teleprinter machine onboard Columbia. New formats were invented to accomplish this task, and the new Crew Activity Planning System used to generate the preflight and as-flown timelines was honed for use tracking the changes to the timeline during the flight. The orbiter thermal tests showed that the payload bay doors would not close under some conditions. NASA became the “butt” of jokes when the space toilet quit working. The author and her husband hardly saw one another during the flight in March 1982 because they were controllers on different shifts.] http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png

A Passion for SpaceSTS-3: Realtime Flight Planning

Part of the Springer Praxis Books Book Series
A Passion for Space — Jun 5, 2015

Loading next page...
 
/lp/springer-journals/a-passion-for-space-sts-3-realtime-flight-planning-uGhVsBDybR

References (0)

References for this paper are not available at this time. We will be adding them shortly, thank you for your patience.

Publisher
Springer International Publishing
Copyright
© Springer International Publishing Switzerland 2016
ISBN
978-3-319-20257-0
Pages
163 –192
DOI
10.1007/978-3-319-20258-7_9
Publisher site
See Chapter on Publisher Site

Abstract

[Because the STS-3 crew, Jack Lousma and Gordon Fullerton, suffered from space adaptation syndrome, Mission Operations Director Gene Kranz ordered the first woman Flight Activities Officer, Carolynn Conley, and the author who was the lead Timeline for the flight, to “swap” two days of the Crew Activity Plan. The only way to transmit the changes to the crew was via a primitive teleprinter machine onboard Columbia. New formats were invented to accomplish this task, and the new Crew Activity Planning System used to generate the preflight and as-flown timelines was honed for use tracking the changes to the timeline during the flight. The orbiter thermal tests showed that the payload bay doors would not close under some conditions. NASA became the “butt” of jokes when the space toilet quit working. The author and her husband hardly saw one another during the flight in March 1982 because they were controllers on different shifts.]

Published: Jun 5, 2015

Keywords: Sleep Period; White Sand; Beverage Container; Post Flight; Planning Shift

There are no references for this article.